African Sales and Business Development Office for +GF+ Piping Systems

African Sales and Business Development Office for +GF+ Piping Systems

+ PROJECTS

  • 2016 - DRC
    CHEMAF – Etoile – EW Cell Feed Valves
  • 2016 - DRC
    ENRC - Boss Mining - Boss Mining Heap-leaching Flow Meter
  • 2017 - DRC
    ENRC - Boss Mining - Boss 50 Project – RTR Tailings Processing Plant
  • 2018 - Republic of Guinea
    Siguiri Mine – Double Containment Piping
  • 2018 - Zambia
    Ashtrom – Kala Housing Project – HDPE Water pipelines
  • 2018 - Mali
    Hummingbird – Yanfolila Mine – HDPE Tailing, Process Plant & Potable Water
  • 2018 - DRC
    ENRC - Boss Mining - Welding Machines
  • 2019 - DRC
    KCC – EW Replacement of all Ball & Diaphargm Valves
  • 2019 - DRC
    China Molybdenum- TFM - Instrumentation – Replacement of Magmeters 2552
  • 2020 - Burkino Faso
    IAMGOLD – Essakane Mine – Replacement of Steel Line for Cyanide to Double Containment
  • 2022 - KCC Tank house
    Redesign and supply of Material for EW Inlet at KCC Tank house 3 & 4
  • 2022 - Metalkol
    Redesign and supply of Material for EW Inlet at Metalkol
  • 2022 - MMG Kinsevere
    Redesign and supply of Material for EW Inlet at MMG Kinsevere
  • 2022 - Mutanda
    Redesign Concept for EW Tank house 5 at Mutanda Mining

+ PROJECTS

  • 2016 - DRC
    CHEMAF – Etoile – EW Cell Feed Valves
  • 2016 - DRC
    ENRC - Boss Mining - Boss Mining Heap-leaching Flow Meter
  • 2017 - DRC
    ENRC - Boss Mining - Boss 50 Project – RTR Tailings Processing Plant
  • 2018 - Republic of Guinea
    Siguiri Mine – Double Containment Piping
  • 2018 - Zambia
    Ashtrom – Kala Housing Project – HDPE Water pipelines
  • 2018 - Mali
    Hummingbird – Yanfolila Mine – HDPE Tailing, Process Plant & Potable Water
  • 2018 - DRC
    ENRC - Boss Mining - Welding Machines
  • 2019 - DRC
    KCC – EW Replacement of all Ball & Diaphargm Valves
  • 2019 - DRC
    China Molybdenum- TFM - Instrumentation – Replacement of Magmeters 2552
  • 2020 - Burkino Faso
    IAMGOLD – Essakane Mine – Replacement of Steel Line for Cyanide to Double Containment
  • 2022 - KCC Tank House
    Redesign and supply of Material for EW Inlet
  • 2022 - Metalkol
    Redesign and supply of Material for EW Inlet
  • 2022 - MMG Kinsevere
    Redesign and supply of Material for EW Inlet
  • 2022 - Mutanda
    Redesign Concept for EW Tank house 5 at Mutanda Mining